Molonglo Bridge One Step Closer

Share:

The Molonglo River Bridge is one step closer after the ACT Government called for expressions of interest for the tender to build the 1 hundred and 50 million dollar project.

The $150 million project would create 500 jobs, finish John Gorton Drive and connect western Canberra.

The disconnect between the Molonglo Valley and Canberra has been a concern after heavy rain flooded Coppins Crossing and an accident simultaneously brought the Tuggeranong Parkway to a standstill last year, cutting off Molonglo residents.

The development is also being designed with a future light rail connection in mind.

The design phase is expected to last until mid next year with the bridge set to open at the end of 2025.

The post Molonglo Bridge One Step Closer appeared first on 2CC Talking Canberra.